BDO 2020 Construction Survey – Taking the Pre and Post-Covid Pulse

Share This:

Advisory firm BDO NZ has released the 2020 Construction Survey. In two parts this year – giving a pre and post-COVID snapshot of the industry, the 2020 survey report looks at the impact COVID-19 has had on the industry and the industry’s key concerns and strategies for survival and growth. Here are some of the report’s key insights.

+ The greatest impact of COVID is the uncertainty of future work

+ 69% had contracts cancelled or delayed due to COVID-19

+ Number 2 concern is falling margins

+ The ‘race to the bottom’ is at risk of being underway

+ 90% needed to apply for the wage subsidy

+ 31% reduced or delayed dividends

+ 85% can pay their creditors when due

+ The forward work pipeline (pre-COVID) improved

Source: The BDO Construction Survey 2020

You can download and read the full report here:

Download the Construction Survey 2020

More To Explore

Community

Project Updates

Darrell, Marlene, and the team are proud to announce that Trigg has been awarded the main contractor role to partner with Stand Children’s Services Tu Maia Whānau (Stand) to redevelop the Maunu premises. This is a significant project for Stand and the Whangarei and Northland community.

General

Meet the Team: Hayley Ludgate

Hayley joined the team in October this year in a Construction Support role and as Trigg’s Health and Safety Officer. Based at Trigg HQ with Marlene, Hayley likes to be busy and has added huge value to the team’s work in the short time she’s been with us.

Thanks for downloading our FREE guide

Check your email inbox – it’s on its way!